Demand Planning

See demand earlier. Plan smarter. Run calmer.

Turn historical sales, seasonality, and current signals into an actionable demand plan. Align purchasing, production, and inventory before problems show up.
app.otiox.comFig. 00

Demand plan overview

Forecast, coverage, and exception signals — Central DC · All channels

Rolling 12-wk · Base scenario
Consensus forecast vs actual (units)
Last refresh · Today 06:00
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
FG assemblies · blend of channelsSeasonality · industrial calendar
Planning exceptions
FG-HYD-104
Low cover — 9d to safety stock
FG-MRP-882
Promo uplift expected W6–W8
RM-STL-440
Demand flattening vs prior forecast
Forecast accuracy (rolling)
91%
SKUs below safety stock
4
Planning coverage
89%
Projected demand (8 wk)
14.2k units
Exceptions · review
4 SKUs
Channel coverage
North America · EMEA
Search SKU / assembly
All assembliesShortfallExpiry risk
AssemblySKUPick strategyOn handUsableAvail.Planning status
Hydraulic manifold block · FG
FG-HYD-104
FEFO
840
620
508
MO expiry window
Precision gearbox housing
FG-MRP-882
FIFO
312
312
298
Stable
Control PCB assembly
FG-CTL-515
FIFO
560
560
560
Stable
Steel housing weldment
FG-WLD-203
FIFO
144
120
88
Shortfall vs plan
127 assemblies

FG-HYD-104 · Hydraulic manifold block

Coverage breakdown · raw lots + reserved FG tied to open work orders

Lots (12)POs (4)WO impact (3)Simulate scenario
ReferenceInboundLocationStatusExpiry / shelf
LOT-RM-20260312-A01
Mar 10
Receiving
Quarantine · QA
Sep 2027
LOT-RM-20260314-B02
Mar 12
Staging
Awaiting release
Sep 2027
PO-45821 · Line 3
Mar 14
Main DC
Reserved · WO-8841
Oct 2027
LOT-FG-20260309-HYD
Mar 9
Cell B · bin 12
Available
—
Shelf-life risk (90d)
186 kg equiv.
QA hold
2 lots
Net coverage vs demand
11 / 14 days
01

Built for real planning decisions

From forecast to execution, every step connects to operations.
01

Forecast that learns from reality

Blend historical demand with trend shifts and promotions to get practical, continuously updated projections.
02

Plan by SKU, channel, and location

Break forecasts down to the granularity that matters and spot overstock or low-coverage risk early.
03

Convert forecast into action

Push demand plans directly into replenishment and production priorities so teams execute from one shared plan.
04

Scenario planning in minutes

Model best/base/worst scenarios and instantly see impact on materials, capacity, and cash.
02

How teams use demand planning in Otiox

A simple rhythm your team can follow each week.
  1. 01

    Start with the baseline

    Pull in sales history and open demand to get the initial forecast picture.

  2. 02

    Add what you know

    Layer in seasonality, upcoming promotions, and any known supply constraints.

  3. 03

    Work through the outliers

    A quick scan of SKUs with high variance or low coverage surfaces what needs attention.

  4. 04

    Align the team

    Confirm the planning version and share one number with purchasing and production.

  5. 05

    Keep it current

    Refresh each week, compare what happened against the forecast, and accuracy improves over time.

03

What teams get after rollout

Planning becomes faster, clearer, and much less reactive.
01

Fewer stockouts

Critical SKUs are replenished earlier based on predicted demand, not panic orders.
02

Lower excess stock

Slow-moving items are caught earlier so purchasing can adjust before capital gets stuck.
03

Better production rhythm

Work orders follow expected demand and capacity windows, reducing firefighting on the floor.
Otiox

Plan demand like a pro

Bring forecasting, replenishment, and production into one connected planning loop.