All use cases
Price Below Contract · Integrity · already happened
  1. 01How it is found
  2. 02What you see
  3. 03What you do next
  4. 04The money
  5. 05In both engines' views
  6. 06On from the start

The contract says $18. The order says $16.

You signed a price with the customer; then someone typed a lower one on the order. Otiox checks order lines against the customer's active contract prices and shows the money each line left on the table.
app.otiox.comFig. 00
Integrity · margin
Order line 11 % under the contract price
Active contract · same currency
SignalMeasuredValue
Contract priceper unit$18.00
Line price200 units$16.00
Under contractthreshold 0.5 %−11 %
Left on the table: $400
What to do

Correct the line price or record the agreed exception.

The order bills the contract price.

01The Challenge

The price was agreed. The order didn't follow it.

For example: the contract price is $18; an order line went out at $16 for 200 units, $400 less than agreed. An old price list, a manual override, a copy of an older order. Nobody checks the line against the contract after it is saved.
  1. 01
    Contract prices live in a document, orders in the system
  2. 02
    Manual overrides are not checked
  3. 03
    Old price lists keep being used
  4. 04
    Each line is small; together they add up
02SEE IT IN OTIOX

The same situation, in the product.

Real screens from the Otiox demo workspace, step by step.
  1. 01

    The finding, and how it happened

    The Integrity Engine's finding names the record and what to do, and its cascade shows how it reached the money. Correct the line price, or record the exception that was agreed.

    The finding, and how it happened
  2. 02

    On, shadow or off

    The scenario's row on the Scenario switches page: how many findings are open, and its switch. It is on from the start; shadow keeps it counting without raising findings.

    On, shadow or off
03

How It Works

Purpose-built features that solve these exact problems.
01

How it is found

Order lines of the last 30 days for a customer with an active or signed contract (same currency, valid on the order date, quantity at or above the contract's minimum) priced more than 0.5 % under the contract price.
02

What you see

The Risk Inbox line "{order · product} priced 11 % under the contract price" with an Open order button, in the Integrity Engine.
03

What you do next

Correct the line price, or record the exception that was agreed.
04

The money

(Contract price − line price) × quantity.
05

In both engines' views

The finding appears in the Integrity Engine with its cascade from the record to the money, in the Risk Inbox and in the Loss Prevention Report.
06

On from the start

The scenario is on by default. Put it in shadow to keep it counting on the margin scenarios screen, with a six-month backtest, without raising findings, or switch it off.
04

What You'll Gain

Tangible improvements that impact your bottom line.
  1. 01
    Contracts honoured both ways

    The price you agreed is the price you bill.

  2. 02
    Money per line

    Each finding says what the line left on the table.

  3. 03
    Counted with every other loss

    Margin findings feed the Loss Prevention Report next to the other engine findings.

  4. 04
    Nothing changes by itself

    No scenario changes a price, a discount or an order. You decide.

05

Real-World Scenarios

See how this works in practice.
Scenario 1

Typed lower

A line goes out at $16 for 200 units; the contract says $18.
Scenario 2

Flagged

The finding shows the line 11 % under the contract price, $400 in total.
Scenario 3

Fixed

The line is corrected before invoicing.
06

The Transformation

From chaos to clarity.
Before
  • Contract in a PDF
  • Overrides unchecked
  • Old price lists reused
  • Leakage found at renewal
After
  • Lines checked against the contract
  • Gap shown in money
  • Corrected or recorded
  • Contract prices kept
07

Frequently Asked Questions

Quick answers to common questions.
01Which contracts count?
Active or signed contracts in the order's currency, valid on the order date, when the line's quantity reaches the contract's minimum.
02Is a tiny rounding difference flagged?
No. Only lines more than 0.5 % under the contract price.
03Who sees the numbers?
Cost and margin figures are shown only to people with cost or accounting rights.
04Does Otiox change prices or orders?
No. No scenario changes a price, a discount or an order. It raises the finding and opens the record; the decision is yours.
05Can I put it in shadow or switch it off?
Yes. Every scenario is on from the start. Per scenario, you can put it in shadow (it keeps counting on the margin scenarios screen, with a six-month backtest, but raises nothing) or switch it off, on the margin card or the Scenario switches page. Thresholds are workspace settings.
06Which currency are the amounts in?
Your books currency, at the store's own rate. With no rate, the amount is left empty, never guessed. VAT is taken out before margins; test, cancelled, refunded, draft and abandoned orders are left out.
Price Below Contract

Ready to transform your price below contract?

See how Otiox can solve your specific challenges.