All use cases
Carrier Invoice Above the Quote · Integrity · already happened
  1. 01How it is found
  2. 02What you see
  3. 03What you do next
  4. 04The money
  5. 05In both engines' views
  6. 06On from the start

Quoted $14.90. Billed $27.40.

The label was bought at a quoted rate. Then surcharges, a re-weigh or a fuel supplement came in on top. Otiox compares what shipments of an order cost with the carrier's quote and shows the difference.
app.otiox.comFig. 00
Integrity · margin
Carrier charged more than quoted
Order · shipments last 30 days
SignalMeasuredValue
Quotedat the label$14.90
Chargedshipments$27.40
Above quotethreshold 10 %+84 %
Above the quote: $12.50
What to do

Check weight and dimensions on the label; claim surcharges that do not apply.

Claim filed; labels carry the right weight.

01The Challenge

The quote was the plan. The bill is what you pay.

For example: an order's label is quoted at $14.90; the shipment is billed $27.40 after a re-weigh and a remote-area surcharge. Nobody compares the carrier's bill with the quote, so the difference is just shipping cost.
  1. 01
    Carrier bills arrive in bulk
  2. 02
    Surcharges are buried in line items
  3. 03
    Wrong weights and dimensions are re-billed
  4. 04
    Nobody claims back what does not apply
02SEE IT IN OTIOX

The same situation, in the product.

Real screens from the Otiox demo workspace, step by step.
  1. 01

    The finding, and how it happened

    The Integrity Engine's finding names the record and what to do, and its cascade shows how it reached the money. Check the weight and dimensions on the label and claim surcharges that do not apply.

    The finding, and how it happened
  2. 02

    On, shadow or off

    The scenario's row on the Scenario switches page: how many findings are open, and its switch. It is on from the start; shadow keeps it counting without raising findings.

    On, shadow or off
03

How It Works

Purpose-built features that solve these exact problems.
01

How it is found

Orders of the last 30 days whose shipments cost more than 10 % above the carrier's quote, and at least 2 more in money. Cancelled and voided shipments are left out.
02

What you see

The Risk Inbox line "Order {n}: carrier charged more than quoted" with an Open order button, in the Integrity Engine.
03

What you do next

Check the weight and dimensions on the label and claim surcharges that do not apply.
04

The money

Charged minus quoted.
05

In both engines' views

The finding appears in the Integrity Engine with its cascade from the record to the money, in the Risk Inbox and in the Loss Prevention Report.
06

On from the start

The scenario is on by default. Put it in shadow to keep it counting on the margin scenarios screen, with a six-month backtest, without raising findings, or switch it off.
04

What You'll Gain

Tangible improvements that impact your bottom line.
  1. 01
    Bills checked against quotes

    Every order where the carrier charged more is on a list.

  2. 02
    Claims with evidence

    Quote and charge side by side for the claim.

  3. 03
    Counted with every other loss

    Margin findings feed the Loss Prevention Report next to the other engine findings.

  4. 04
    Nothing changes by itself

    No scenario changes a price, a discount or an order. You decide.

05

Real-World Scenarios

See how this works in practice.
Scenario 1

Re-weighed

A label quoted at $14.90 is billed $27.40.
Scenario 2

Flagged

The finding shows the order and the $12.50 above the quote.
Scenario 3

Fixed

The weight on the product is corrected and the surcharge claimed.
06

The Transformation

From chaos to clarity.
Before
  • Carrier bills paid in bulk
  • Quotes forgotten
  • Surcharges accepted
  • Wrong weights repeated
After
  • Shipments compared with quotes
  • Difference per order
  • Claims filed
  • Weights corrected
07

Frequently Asked Questions

Quick answers to common questions.
01Where does the quote come from?
From the quoted rate stored on the order's shipments, or the order's carrier cost when it was a quote.
02Are small differences flagged?
No. The charge has to be more than 10 % above the quote and at least 2 more in money.
03Who sees the numbers?
Cost and margin figures are shown only to people with cost or accounting rights.
04Does Otiox change prices or orders?
No. No scenario changes a price, a discount or an order. It raises the finding and opens the record; the decision is yours.
05Can I put it in shadow or switch it off?
Yes. Every scenario is on from the start. Per scenario, you can put it in shadow (it keeps counting on the margin scenarios screen, with a six-month backtest, but raises nothing) or switch it off, on the margin card or the Scenario switches page. Thresholds are workspace settings.
06Which currency are the amounts in?
Your books currency, at the store's own rate. With no rate, the amount is left empty, never guessed. VAT is taken out before margins; test, cancelled, refunded, draft and abandoned orders are left out.
Carrier Invoice Above the Quote

Ready to transform your carrier invoice above the quote?

See how Otiox can solve your specific challenges.