The bill said 100 kg. The order used 140.

A completed production order consumed more of a component than its bill of materials allows for the quantity made. Otiox compares consumption with the bill on every completed order and shows the extra material in money.
app.otiox.comFig. 00
Integrity · margin
More material used than the bill allows
Completed production order
SignalMeasuredValue
Bill allowsfor qty made100 kg
Consumed140 kg
Over the billtolerance 10 %+40 %
Extra material: $168
What to do

Check the bill quantities, the scrap booked and the lots used.

Consumption is back inside the tolerance.

01The Challenge

Every extra sheet is in the unit cost.

For example: the bill allows 100 kg of steel for the quantity made; the order used 140. The extra 40 kg are scrap nobody booked, a wrong bill, or material taken from the wrong lot, and each unit made carries the cost.
  1. 01
    Consumption is booked, never compared
  2. 02
    The bill of materials drifts from reality
  3. 03
    Unbooked scrap hides in consumption
  4. 04
    Unit cost rises without a reason on record
02SEE IT IN OTIOX

The same situation, in the product.

Real screens from the Otiox demo workspace, step by step.
  1. 01

    The finding, and how it happened

    The Integrity Engine's finding names the record and what to do, and its cascade shows how it reached the money. Check the bill quantities, the scrap booked and the lots used. Material use above the tolerance is refused when it is booked through the normal production flow; this finding covers what got through another way (imports, subassemblies, older orders).

    The finding, and how it happened
  2. 02

    On, shadow or off

    The scenario's row on the Scenario switches page: how many findings are open, and its switch. It is on from the start; shadow keeps it counting without raising findings.

    On, shadow or off
03

How It Works

Purpose-built features that solve these exact problems.
01

How it is found

Production orders completed in the last 60 days where a component's consumption is more than the bill allows for the quantity made, plus a tolerance ("Production: material use above the bill by (%)", 10 % by default).
02

What you see

The Risk Inbox line "{MO · component}: more material used than the bill allows" with an Open button, in the Integrity Engine.
03

What you do next

Check the bill quantities, the scrap booked and the lots used. Material use above the tolerance is refused when it is booked through the normal production flow; this finding covers what got through another way (imports, subassemblies, older orders).
04

The money

The extra quantity times the component's cost per unit.
05

In both engines' views

The finding appears in the Integrity Engine with its cascade from the record to the money, in the Risk Inbox and in the Loss Prevention Report.
06

On from the start

The scenario is on by default. Put it in shadow to keep it counting on the margin scenarios screen, with a six-month backtest, without raising findings, or switch it off.
04

What You'll Gain

Tangible improvements that impact your bottom line.
  1. 01
    Bills that match the floor

    Overuse shows which bills need correcting.

  2. 02
    Waste in money

    Each finding prices the extra material.

  3. 03
    Counted with every other loss

    Margin findings feed the Loss Prevention Report next to the other engine findings.

  4. 04
    Nothing changes by itself

    No scenario changes a price, a discount or an order. You decide.

05

Real-World Scenarios

See how this works in practice.
Scenario 1

More than planned

An order uses 140 kg of steel where the bill allows 100 kg for the quantity made.
Scenario 2

Flagged

The finding shows 40 % over the bill and the cost of the extra 40 kg.
Scenario 3

Fixed

The cutting plan is corrected; the next orders stay inside the tolerance.
06

The Transformation

From chaos to clarity.
Before
  • Consumption never compared
  • Bills out of date
  • Scrap unbooked
  • Unit cost drifts
After
  • Every completed order checked
  • Overuse per component
  • Extra material priced
  • Bills corrected
07

Frequently Asked Questions

Quick answers to common questions.
01Is it scaled to the quantity made?
Yes. The bill's quantity is scaled to the units actually produced before comparing.
02Can I change the tolerance?
Yes. "Production: material use above the bill by (%)" is a workspace setting, 10 % by default.
03Who sees the numbers?
Cost and margin figures are shown only to people with cost or accounting rights.
04Does Otiox change prices or orders?
No. No scenario changes a price, a discount or an order. It raises the finding and opens the record; the decision is yours.
05Can I put it in shadow or switch it off?
Yes. Every scenario is on from the start. Per scenario, you can put it in shadow (it keeps counting on the margin scenarios screen, with a six-month backtest, but raises nothing) or switch it off, on the margin card or the Scenario switches page. Thresholds are workspace settings.
06Which currency are the amounts in?
Your books currency, at the store's own rate. With no rate, the amount is left empty, never guessed. VAT is taken out before margins; test, cancelled, refunded, draft and abandoned orders are left out.
Material Over-Consumption

Ready to transform your material over-consumption?

See how Otiox can solve your specific challenges.