Bill of Materials

Every recipe, versioned, costed and ready to build.

Otiox turns raw materials, sub-assemblies, adhesives, packaging and consumables into a structured, multi-level bill of materials — with live cost roll-up, version history and a guided builder that gets a new BOM production-ready in minutes.
app.otiox.comFig. 00
Bluetooth Speakerv2
SKU: BTSPK-240
Total Cost
€31.82
ComponentsOperationsHierarchyCo-productsWhere Used
ComponentQtyTotal
Rubber
Material
1 pcs€31.82
Cost Summary
Material Cost€31.82
Labor Cost€0.00
Overhead Cost€0.00
Total Cost€31.82
Output Quantity12
Cost Per Unit€2.65
1 material component missing tariff data — landed cost may be understated.
01Bill of Materials

Everything a BOM needs to run production

Six capabilities cover the recipe from first draft to shop-floor execution.
01

Guided BOM builder

A five-step wizard — product, components, operations, costs, review — walks you from a blank product to a production-ready recipe.
02

Multi-level components

Add raw materials, sub-assemblies, adhesives, packaging and consumables. Nest BOMs inside BOMs to any depth.
03

Versioning built in

Every BOM carries a version number. Create a new version without breaking the last one — historical MOs keep their snapshot.
04

Disassembly BOMs

Reverse the production process: break a finished product into output parts with cost-allocation percentages.
05

Live cost roll-up

Material, labour and overhead cost sum automatically per component and per BOM, down to cost-per-unit.
06

Where-used and hierarchy

See every parent BOM that references a component, and drill through the full nested hierarchy in one view.
02Guided builder

From blank product to production-ready recipe in five steps.

The BOM builder walks planners through product, components, operations, costs and review. Add raw materials, sub-assemblies, adhesives, packaging or consumables from one menu — save a draft at any point, come back and finish later.
  1. 01
    Five-step wizard: Product → Components → Operations → Costs → Review
  2. 02
    Add Materials, Sub-assembly, Adhesives, Packaging or Consumables
  3. 03
    Operations step is optional — skip straight to costs if you don't need it
  4. 04
    Save Draft at any step, resume exactly where you left off
app.otiox.com
Create Bill of Materials
Add materials, sub-assemblies, fasteners, and more
Product
2
Components
3
Operations (Optional)
4
Costs
5
Review
Components
Add materials, sub-assemblies, fasteners, packaging, and more
+ Add Components
Add Raw Materials
Add Sub-assembly
Add Adhesives
Add Packaging
Add Consumables
CancelSave Draft
BackNext
03Multi-level hierarchy

Nest BOMs inside BOMs, as deep as your product actually is.

A finished product is rarely one flat list — it's an assembly of sub-assemblies. Otiox lets you reference a BOM as a component of another BOM, so the hierarchy in the system matches the hierarchy on your shop floor.
  1. 01
    Unlimited nesting depth — assemblies inside assemblies
  2. 02
    Expand or collapse any level to focus on what matters
  3. 03
    Per-component quantity, unit and scrap % at every level
  4. 04
    Roll-up cost updates automatically when a sub-BOM changes
app.otiox.com

Bill of Materials

Steel Frame Assembly v2.1
Steel Frame Assembly1 unit
Main Frame1 unit
Steel Tube 40x404 m
Corner Bracket8 pcs
Support Legs4 units
Hardware Kit1 kit
04Disassembly BOMs

Run production in reverse — break one product into many.

Disassembly BOMs take a finished product as input and define its output parts, with a cost-allocation percentage that distributes the original cost across every part that comes out.
  1. 01
    Define output parts for any product with an active BOM
  2. 02
    Cost-allocation percentages must sum to 100% — validated live
  3. 03
    Estimated recovery value calculated per output part
  4. 04
    One click creates the reverse manufacturing order
app.otiox.com
Disassembly BOMs
Disassembly BOMs reverse the production process — a finished product is broken down into output parts. Assign cost allocation percentages in the BOM wizard to distribute costs across each output part.
Product (input)StatusCost allocationEst. Recovery
Bluetooth Speaker
BTSPK-240
Active✓ 100%€31.82 (100%)
SmartSensor S100
SEN-S100
Active✓ 100%€212.40 (92%)
Cost allocation sums to 100% on every active disassembly BOM.
05

Versions, sets, products and auto-assembly

Everything that surrounds the recipe itself.
01

Version history

Every BOM change creates a new version. Historical manufacturing orders keep the exact recipe snapshot they were built with.
02

Sets and bundles

Combine multiple finished products into a sellable set or kit, with its own BOM-style component breakdown.
03

Co-products

Model production runs that yield more than one sellable output, splitting cost across each co-product.
04

Auto-assembly

Trigger a manufacturing order automatically when a sales order needs a product with an active BOM — match-order or fill-the-gap quantity modes.
06

From first component to costed recipe

Five steps that the BOM builder walks you through.
  1. 01

    Pick the product

    Choose the finished good or sub-assembly this BOM produces

  2. 02

    Add components

    Raw materials, sub-assemblies, adhesives, packaging, consumables

  3. 03

    Define operations

    Optional — attach the production steps this recipe requires

  4. 04

    Review costs

    Material, labour and overhead roll up to a cost-per-unit

  5. 05

    Publish and version

    Save as v1, or a new version if the product already has a BOM

07

Recipes that stay accurate as the product line grows.

Spreadsheet BOMs drift the moment two people edit them. Otiox keeps one live, versioned recipe per product — with the cost roll-up, hierarchy and where-used view that planners actually need.
  1. 01
    Guided five-step builder, not a blank spreadsheet
  2. 02
    Multi-level nesting with live cost roll-up
  3. 03
    Version history without breaking past manufacturing orders
  4. 04
    Disassembly BOMs for reverse production
  5. 05
    Where-used view across every parent BOM
  6. 06
    Auto-assembly triggers manufacturing orders
  7. 07
    Raw materials, sub-assemblies, adhesives, packaging, consumables
  8. 08
    Cost-per-unit calculated automatically
app.otiox.com
Bluetooth Speakerv2
SKU: BTSPK-240
Total Cost
€31.82
ComponentsOperationsHierarchyCo-productsWhere Used
ComponentQtyTotal
Rubber
Material
1 pcs€31.82
Cost Summary
Material Cost€31.82
Labor Cost€0.00
Overhead Cost€0.00
Total Cost€31.82
Output Quantity12
Cost Per Unit€2.65
1 material component missing tariff data — landed cost may be understated.
Otiox

Build your first BOM in minutes, not spreadsheets.

Spin up a workspace with seeded products and walk a real recipe through the builder end to end.