MRP features

Production planning that finally feels calm.

Orders, materials, machines and people — together in one quiet place. Otiox shows you what to make next and what you need for it, so every day on the floor starts with a clear plan.
app.otiox.comFig. 00

Production Schedule

Week 48, 2024
Mon
Tue
Wed
Thu
Fri
WO-001Steel Frame Assembly
60%
WO-002Aluminum Housing
WO-003PCB Module v2
85%
WO-004Power Supply Unit
01MRP & Planning

Everything your workshop needs, in one place

Six tools that work together, from the first order to the finished product on the shelf.
Active Work Orders
3 active
WO-2024-089In Progress
Motor Assembly A · Qty: 24
WO-2024-090Queued
PCB Controller · Qty: 100
WO-2024-091Materials Ready
Sensor Module B · Qty: 50
01

Manufacturing orders

Create and track MOs end-to-end. Each order carries its BOM snapshot, component reservations, scheduled date, priority, status (Scheduled → In progress → Done) and a downloadable run summary.

Production Schedule

Week 48, 2024
Mon
Tue
Wed
Thu
Fri
WO-001Steel Frame Assembly
60%
WO-002Aluminum Housing
WO-003PCB Module v2
85%
WO-004Power Supply Unit
02

Production planning & scheduling

Order book with rank, deadline, planned start/end, machine assignment and material readiness. Drag-and-drop to re-rank, filter by location / machine / material / date, group or flatten the view.

Bill of Materials

Steel Frame Assembly v2.1
Steel Frame Assembly1 unit
Main Frame1 unit
Steel Tube 40x404 m
Corner Bracket8 pcs
Support Legs4 units
Hardware Kit1 kit
03

Multi-level bills of materials

Nest BOMs to any depth, version each one, snapshot per MO. Components carry quantity, unit cost, scrap %. Total stock, reserved and available roll up live per product.
MO-2026-0001Scheduled
Order information
ProductSmartSensor S100
Quantity30
Prioritynormal
Scheduled27/06/2026
Cost breakdown
Material€838.20
Labour€420.00
Overhead€871.80
Total€2,130.00
Component status
ComponentRequiredTotal cost
PCB Mainboard Rev330 pcs€555.00
Li-Ion Battery 3000mAh30 pcs€276.00
Aluminum 6061 Sheet1.5 kg€7.20
04

MO approvals & quality control

Configurable approval chains per value, supplier or priority. Built-in QC inspections with evidence attachments. Production Tasks workflow for operators on the floor.
Demand Forecast
+12% trend
JanFebMarAprMayJun
Actual
Forecast
05

Demand planning & forecasting

Statistical and seasonal forecast per SKU on a 12-week horizon. Reorder suggestions and safety-stock recommendations. MO impact reports show how a planning change ripples through your stock.
Resource UtilizationThis Week
Assembly Line A34/40h
Assembly Line B25/40h
CNC Station38/40h
Quality Check18/40h
Avg. utilization72%
06

Capacity & shop-floor execution

Define machine and operator capacity, calendar, shift patterns. Capacity-aware scheduling. Production Floor portal so operators clock onto tasks from a tablet.
02

Your whole week, at a glance

One friendly board for planners and production leads. Move an order, and everyone sees the new plan straight away.
  1. 01
    Open / Done split with one click
  2. 02
    Filter by location, machine, material, date range
  3. 03
    Sort by rank, quantity, deadline; group by status or assignee
  4. 04
    Inline machine assignment and planned-time edit
  5. 05
    Material readiness chip on every row (Ready / Blocked / Consumed)
app.otiox.com

Production Schedule

Week 48, 2024
Mon
Tue
Wed
Thu
Fri
WO-001Steel Frame Assembly
60%
WO-002Aluminum Housing
WO-003PCB Module v2
85%
WO-004Power Supply Unit
03

Recipes you can rely on, even as you grow

Write down how each product is made once. Otiox remembers costs, scrap and versions — and keeps every past order exactly as it was.
  1. 01
    Multi-level nesting with infinite depth
  2. 02
    Per-product variants and version control
  3. 03
    Component unit cost, scrap %, lead time
  4. 04
    Live total stock / reserved / available roll-up
  5. 05
    Multi-variant BOMs for the same product
app.otiox.com

Bill of Materials

Steel Frame Assembly v2.1
Steel Frame Assembly1 unit
Main Frame1 unit
Steel Tube 40x404 m
Corner Bracket8 pcs
Support Legs4 units
Hardware Kit1 kit
04

Every order, with its whole story on one screen

Open an order and it's all there — what it costs, which parts are ready, who's working on it and what's been checked. No digging, no guessing.
  1. 01
    Material, labour, overhead and total cost roll-up
  2. 02
    Component status row shows what's in stock right now
  3. 03
    Production tasks workflow for the operator portal
  4. 04
    Built-in approval status with multi-level chains
  5. 05
    QC inspections with evidence attachments
  6. 06
    Downloadable PDF run summary
app.otiox.com
MO-2026-0001Scheduled
Order information
ProductSmartSensor S100
Quantity30
Prioritynormal
Scheduled27/06/2026
Cost breakdown
Material€838.20
Labour€420.00
Overhead€871.80
Total€2,130.00
Component status
ComponentRequiredTotal cost
PCB Mainboard Rev330 pcs€555.00
Li-Ion Battery 3000mAh30 pcs€276.00
Aluminum 6061 Sheet1.5 kg€7.20
05

Your people, machines and routines, well looked after

Planning is only half the job. Otiox helps the floor run smoothly day to day, too.
01

Operations

Library of manufacturing operations with standard time, machine and operator requirements per step.
02

Operators

Operator roster with skills, calendar, shift patterns and active task assignments.
03

Machines

Machine list with capacity, calendar, current MO and downtime history.
04

Maintenance

Preventive maintenance schedules per machine with reminders and work-history log.
06

From the first order to a happy customer

Six simple steps. Otiox walks you through each one, so nothing slips through the cracks.
  1. 01

    Sales order or forecast

    Demand enters from a sales order or the forecasting suite

  2. 02

    MRP run suggests MOs

    The engine explodes BOMs and proposes the right MOs + POs

  3. 03

    Approve & schedule

    Approve the MO and drop it on the production schedule with machines

  4. 04

    Operator portal

    Operators clock on, complete production tasks, log QC and time

  5. 05

    Done & costed

    Finished goods land in stock with rolled-up actual material, labour, overhead

  6. 06

    Ship & report

    Reserved for the sales order; pick / pack / ship; reports update

07

Made for the people who actually build things

A lot of MRP software feels heavy from day one. Otiox stays simple and quick, so your team feels at home on day two — not month two.
  1. 01
    Full MRP, not bolt-on modules
  2. 02
    Multi-level BOMs with snapshotting
  3. 03
    Drag-and-drop production schedule
  4. 04
    Capacity-aware planning
  5. 05
    Approval chains by value / supplier / priority
  6. 06
    Operator portal for the shop floor
  7. 07
    12-week statistical demand forecast
  8. 08
    Reorder + safety-stock recommendations
app.otiox.com
Demand Forecast
+12% trend
JanFebMarAprMayJun
Actual
Forecast
Otiox

Come and see how it feels

Start with a ready-made sample workspace and follow one order from sale to shipment. It takes about ten minutes, with no pressure at all.