MRP features

Plan production. Build product. Hit deadlines.

Otiox MRP is the full Material Requirements Planning stack — manufacturing orders, scheduling, BOMs, approvals, operators, machines, demand forecasting — in one workspace. No bolt-on apps, no per-module licences.

app.otiox.com

Production Schedule

Week 48, 2024
Work Order
Mon
Tue
Wed
Thu
Fri

WO-001

Steel Frame Assembly

60%
60%
60%

WO-002

Aluminum Housing

WO-003

PCB Module v2

85%
85%
85%

WO-004

Power Supply Unit

Everything MRP, in one workspace

Six core capabilities cover the planning loop from sales order to shipped finished good.

Active Work Orders
3 active
WO-2024-089In Progress
Motor Assembly A · Qty: 24
WO-2024-090Queued
PCB Controller · Qty: 100
WO-2024-091Materials Ready
Sensor Module B · Qty: 50

Manufacturing orders

Create and track MOs end-to-end. Each order carries its BOM snapshot, component reservations, scheduled date, priority, status (Scheduled → In progress → Done) and a downloadable run summary.

Production Schedule

Week 48, 2024
Work Order
Mon
Tue
Wed
Thu
Fri

WO-001

Steel Frame Assembly

60%
60%
60%

WO-002

Aluminum Housing

WO-003

PCB Module v2

85%
85%
85%

WO-004

Power Supply Unit

Production planning & scheduling

Order book with rank, deadline, planned start/end, machine assignment and material readiness. Drag-and-drop to re-rank, filter by location / machine / material / date, group or flatten the view.

Bill of Materials

Steel Frame Assembly v2.1
Steel Frame Assembly1 unit
Main Frame1 unit
Steel Tube 40x404 m
Corner Bracket8 pcs
Support Legs4 units
Hardware Kit1 kit

Multi-level bills of materials

Nest BOMs to any depth, version each one, snapshot per MO. Components carry quantity, unit cost, scrap %. Total stock, reserved and available roll up live per product.

MO-2026-0001Scheduled
Order information
ProductSmartSensor S100
Quantity30
Prioritynormal
Scheduled27/06/2026
Cost breakdown
Material€838.20
Labour€420.00
Overhead€871.80
Total€2,130.00
Component status
ComponentRequiredTotal cost
PCB Mainboard Rev330 pcs€555.00
Li-Ion Battery 3000mAh30 pcs€276.00
Aluminum 6061 Sheet1.5 kg€7.20

MO approvals & quality control

Configurable approval chains per value, supplier or priority. Built-in QC inspections with evidence attachments. Production Tasks workflow for operators on the floor.

Demand Forecast
+12% trend
JanFebMarAprMayJun
Actual
Forecast

Demand planning & forecasting

Statistical and seasonal forecast per SKU on a 12-week horizon. Reorder suggestions and safety-stock recommendations. MO impact reports show how a planning change ripples through your stock.

Resource UtilizationThis Week
Assembly Line A34/40h
Assembly Line B25/40h
CNC Station38/40h
Quality Check18/40h
Avg. utilization72%

Capacity & shop-floor execution

Define machine and operator capacity, calendar, shift patterns. Capacity-aware scheduling. Production Floor portal so operators clock onto tasks from a tablet.

A single planning workspace from order to shipped

The Production Planning view is the daily home for planners and production leads. Filter, group, drag-and-drop — the changes write straight back to the order book.

  • Open / Done split with one click
  • Filter by location, machine, material, date range
  • Sort by rank, quantity, deadline; group by status or assignee
  • Inline machine assignment and planned-time edit
  • Material readiness chip on every row (Ready / Blocked / Consumed)
app.otiox.com

Production Schedule

Week 48, 2024
Work Order
Mon
Tue
Wed
Thu
Fri

WO-001

Steel Frame Assembly

60%
60%
60%

WO-002

Aluminum Housing

WO-003

PCB Module v2

85%
85%
85%

WO-004

Power Supply Unit

Recipes that stay accurate as you scale

Define each product's bill of materials once. Otiox stores cost, scrap and version per component and snapshots the BOM into every MO so historical orders never silently change.

  • Multi-level nesting with infinite depth
  • Per-product variants and version control
  • Component unit cost, scrap %, lead time
  • Live total stock / reserved / available roll-up
  • Multi-variant BOMs for the same product
app.otiox.com

Bill of Materials

Steel Frame Assembly v2.1
Steel Frame Assembly1 unit
Main Frame1 unit
Steel Tube 40x404 m
Corner Bracket8 pcs
Support Legs4 units
Hardware Kit1 kit

Every manufacturing order is its own mini project

Open an MO and see everything in one screen — order info, full cost breakdown (material + labour + overhead), component status with required / available / reserved / consumed, production tasks, approval chain and QC inspections.

  • Material, labour, overhead and total cost roll-up
  • Component status row shows what's in stock right now
  • Production tasks workflow for the operator portal
  • Built-in approval status with multi-level chains
  • QC inspections with evidence attachments
  • Downloadable PDF run summary
app.otiox.com
MO-2026-0001Scheduled
Order information
ProductSmartSensor S100
Quantity30
Prioritynormal
Scheduled27/06/2026
Cost breakdown
Material€838.20
Labour€420.00
Overhead€871.80
Total€2,130.00
Component status
ComponentRequiredTotal cost
PCB Mainboard Rev330 pcs€555.00
Li-Ion Battery 3000mAh30 pcs€276.00
Aluminum 6061 Sheet1.5 kg€7.20

Operations, operators, machines and maintenance

Everything required to actually run the floor — not just plan it.

Operations

Library of manufacturing operations with standard time, machine and operator requirements per step.

Operators

Operator roster with skills, calendar, shift patterns and active task assignments.

Machines

Machine list with capacity, calendar, current MO and downtime history.

Maintenance

Preventive maintenance schedules per machine with reminders and work-history log.

From sales order to shipped product

Six steps that the MRP suite walks you through automatically.

1

Sales order or forecast

Demand enters from a sales order or the forecasting suite

2

MRP run suggests MOs

The engine explodes BOMs and proposes the right MOs + POs

3

Approve & schedule

Approve the MO and drop it on the production schedule with machines

4

Operator portal

Operators clock on, complete production tasks, log QC and time

5

Done & costed

Finished goods land in stock with rolled-up actual material, labour, overhead

6

Ship & report

Reserved for the sales order; pick / pack / ship; reports update

MRP that planners and operators actually use

Most MRP tools either drown you in fields or fall apart the first time a real order comes in. Otiox keeps the planning model lean and the operator screens fast — so your team uses it on day two, not day sixty.

Full MRP, not bolt-on modules
Multi-level BOMs with snapshotting
Drag-and-drop production schedule
Capacity-aware planning
Approval chains by value / supplier / priority
Operator portal for the shop floor
12-week statistical demand forecast
Reorder + safety-stock recommendations
app.otiox.com
Demand Forecast
+12% trend
JanFebMarAprMayJun
Actual
Forecast

See the MRP stack in action

Spin up a workspace with realistic seed data and walk an MO from sales order to shipped product in under ten minutes.