Otiox Command · Investigations & Causal Map

Cause and effect, already present in your records.

A late customer order rarely begins with itself. It begins with a supplier that slipped, a machine that stopped, a lot that failed inspection. Otiox keeps the link between each of these and the order they affected, together with the sequence in which they happened, so the chain is already there to be read. The Causal Map shows it; Investigations let your team test competing explanations until one stands.
app.otiox.comFig. 00
Causal Map
Each chain is a hypothesis until an investigation supports or refutes it.
ChainsDependenciesConfirmed links
Supplier delay → late productionConfirmedLinked recordsOrder in timeStrong
PO-PRED-0001
+33 d late
Shenzhen Precision
MO-PRED-0001
+24 d late
SO-PRED-0001
Machine down → late productionHypothesisLinked recordsOrder in timeModerate
CNC-01
Spindle bearing seized
MO-PRED-0001
+24 d late
SO-PRED-0001
01

Causality, not conjecture.

The relationships between your records already contain the explanation. Otiox makes them legible, and treats every explanation as a hypothesis until the evidence settles it.
Chain · confirmedStrong
PO-PRED-0001 · Shenzhen Precision
+33 d
→ MO-PRED-0001
+24 d
→ SO-PRED-0001
at risk
01

Causal chains

Known patterns — supplier delay to late production, machine down to late production, quality rework to late production — traced record by record, with the delay at each step.

The whole story, on one line

Evidence for this chain
Linked records
yes
Order in time
yes
Repeated in the past
3 times
Strength
Strong
02

Evidence on every link

Each chain lists what supports it: linked records, the right order in time, and whether the same pattern has occurred before. Its strength is stated as Strong or Moderate.

The weight of an explanation, made visible

Chain status
Supplier delay → late production
confirmed
Machine down → late production
hypothesis
Quality rework → late production
refuted
03

Hypothesis until shown

Every chain begins as a hypothesis. It is confirmed only when an investigation supports it, and refuted when the evidence points elsewhere.

No conclusion without proof

Why was MO-PRED-0001 late?Open
H1 · supplier delay
3 for · 0 against
H2 · CNC-01 breakdown
1 for · 2 against
Cases
2 orders
Conclusion
pending
04

Structured investigations

A question, the cases behind it, competing explanations with evidence for and against each, and a conclusion — all bound to the underlying records.

Understanding that survives a hand-over

Recurring causes · 180 days
Shenzhen Precision
behind 6 late MOs
CNC-01
behind 2 late MOs
Quality rework
behind 0
05

Patterns across time

Chains filtered by cause and window — 30, 90 or 180 days — reveal whether one supplier or one machine keeps appearing behind late orders.

The recurring cause, not the passing symptom

Confirmed links in use
Supplier delay → late production
weighted
Used in open predictions
4
Confirmed by
INV-0003
06

Confirmed links inform the future

Once a cause is confirmed, the Predictive Engine gives it weight in future predictions. Each investigation sharpens the next forecast.

A system that learns from every answer

02

From a question to a conclusion.

Open an investigation from a late order or a control exception. Otiox gathers the related records and proposes explanations; your team adds evidence for and against until the answer is clear.
  1. 01
    Begin from any record, risk or control exception
  2. 02
    Competing hypotheses, each with its own evidence
  3. 03
    Evidence that points to real records, not screenshots
  4. 04
    A conclusion that confirms or refutes the chain
app.otiox.com
Command · investigation
Why is production late?
All late manufacturing orders, last six months
SuspectLate casesAll cases
Inspection benchEvery late caseSame share
Component supplierA fifthA fifth
Pick-and-placeA fifthA fifth
Hypotheses with evidence for and against
Investigate

Test each explanation against all orders.

One supported cause fixes many delays.

03

How an investigation unfolds

From a late order to a confirmed cause.
  1. 01

    Ask

    Why was this order late? Begin from the record itself

  2. 02

    Trace

    Otiox follows the chains that lead to it

  3. 03

    Hypothesise

    Set competing explanations side by side

  4. 04

    Weigh

    Attach the evidence for and against each

  5. 05

    Conclude

    Confirm or refute — and every view updates

04

Reasoning that remains readable.

Open and concluded investigations sit together with their question, type, hypotheses and evidence. Anyone who joins later can follow how an answer was reached, and why.
  1. 01
    Typed questions, such as 'Why is production late?'
  2. 02
    Hypothesis and evidence counts at a glance
  3. 03
    Open and concluded status, with age
  4. 04
    Linked to the decisions that followed
app.otiox.com
Investigations
A question, the cases behind it, competing explanations with the evidence for and against each, and a conclusion.
+ New investigation
Control exception: PO approval above the thresholdHypotheses: 0 · evidence: 1Open
Why was MO-PRED-0001 late?Hypotheses: 2 · evidence: 2Open
Why are CNC-01 orders slipping?Hypotheses: 3 · evidence: 5Open
Why was MO-PRED-0003 late?Hypotheses: 1 · evidence: 2Concluded
05

The idea, applied.

Scenarios from the demo workspace, walked through step by step — on the same data you receive when you sign up.
07

Questions

01Where do the causal chains come from?
From relationships already present in your records: a purchase order supplies a material, the material is reserved for a manufacturing order, the order builds goods for a customer. Otiox examines timing and history to judge the strength of each chain.
02What distinguishes a hypothesis from a confirmed link?
Every chain begins as a hypothesis. It is confirmed only when an investigation concludes in its favour, and refuted when the evidence goes against it.
03Can we investigate more than late production?
Yes. An investigation can begin from any record, risk or control exception — a purchase order approved above its threshold, for example.
04Does this replace our quality or 8D process?
It supports it. Investigations keep the question, explanations, evidence and conclusion beside the real records, which makes formal reports faster to prepare and easier to defend.
Otiox

Understand why — once, and for good.

Open the demo workspace and follow a supplier delay all the way to the customer order it placed at risk.